Preparation
Before installation, ensure safety by turning off the main water supply. Remove the old fixture and clean the wall surface to ensure it is smooth and free of debris.
Installing Embedded Components
Mark the installation position on the wall according to the specifications in the manual. Use a hammer drill to create holes, insert expansion bolts, and securely fasten the embedded components.
Connecting the Thermostatic Valve Body
Connect the thermostatic valve body to the embedded components. Use a spirit level to ensure it is perfectly horizontal, connect the hot and cold water pipes correctly, and tighten the connection nuts to prevent leaks.
Installing the Shower Fixtures
For the handheld shower, mount the bracket on the wall and connect the hose. For the overhead shower, adjust the angle to ensure the water spray is directed correctly.
Testing and Inspection
Turn on the main water supply and check all connections for leaks. Test the thermostatic valve's temperature adjustment function to ensure it operates correctly. Finally, clean the installation area to ensure a neat and tidy finish.
